A16 motorway (Switzerland)

A16

Location of the A16 in Switzerland
Route information
Length: 84 km (52 mi)
Highway system

Highways in Switzerland
Motorways of Switzerland

The A16, a motorway in north-central Switzerland, is a divided freeway connecting the border to France to the A5 motorway, 84 kilometres (52 mi) to the south on the Swiss plateau.[1]

The A16 motorway is a long, winding corridor that crosses the Jura Mountains from the Canton of Jura through part of the Bernese Jura area, to the flat part of the canton of Berne on the Swiss plateau. Therefore it is called Transjurane. It is congruent with the National Highway N16 and following its anticipated completion around 2020-2030, it will connect the French motorway network with the rest of the Swiss national road network. The extension provides for both four-lane standard (highway) and two-lane sections of "express roads" (Autostrasse). At present (2008), there are approximately 48.5 km (57%) of roadway in operation, other sections are under construction or are in planning.

Contents

History

The A16 starts at Boncourt in the Ajoie at the border between Switzerland and France. It runs south across the Ajoie plateau to Porrentruy, where it veers to the east. It crosses the northern Jura chains in Saint-Ursanne through two long tunnels, and reaches Glovelier, on the plateau of Delémont. After bypassing that city, the A16 turns south again, and follows the course of the Birse via Moutier and Court until Tavannes. Upon crossing Col de Pierre Pertuis through tunnels, the A16 follows the valley of the Suze (German:Schüss). It divides itself into a double lane road with separate downhill and uphill traffic on either side of the gorge of Taubenloch. It then reaches, the level of the Swiss plateau east of Biel/Bienne, connecting to the A5.

Status of construction

The following sections are in operation:

The following sections are under construction:

The following sections are currently still in the planning phase:

Because of the current financial constraints, the Swiss Federal Government can postpone most of the works on new sections. The connection of the A16 to the A36 motorway in France (Mulhouse - Dijon) between Montbéliard and Belfort is to be completed within a time horizon of 2025-2030.

Costs

Along its course, the A16 has many engineering structures, mainly tunnels but also some bridges. Therefore, the A16 is one of the most expensive road projects in Switzerland. For the whole line, a total cost of 5.6 billion Swiss francs is estimated.

Tunnels

Because of the difficult terrain in the area of the Jura Mountains, the construction of numerous tunnels is necessary to pass underneath the various Jura chains. The main tunnels (from north to south) with a length of more than 1 kilometre (0.62 mi) are:

There are 16 more tunnels that are less than 1 kilometre (0.62 mi) in length and were partly created in open pits. Some tunnels are, or have been, built to protect the residents of nearby villages and hamlets from the noise emissions.

History

The A16 was not one from the start to the national motorway network in Switzerland, although there were initial projects of Jura rapid-traverse between Biel and Belfort, as early as 1964. The inclusion of the A16 in the plan of the national road network came in 1984, after the population had approved construction in the Canton of Jura, with a large majority (71%). The highway should be the favored new project of the Jura and the Ajoie. The efficient transport corridor is to ensure, after completion, a much faster connection to the rest of Switzerland.

Even after entering the national motorway network, there was the part of environmentalists strong opposition to the project. In the context of the so-called Clover Initiative, the construction of the A16 should be submitted to the entire Swiss population to vote. Due to the high acceptance of the project in the affected regions, the request was withdrawn before a vote on other controversial motorway cuts (in April 1990).

Paleontology

During the construction work on the A16, in the vicinity of Courtedoux, workers found a slab with about 500 footprints of dinosaurs, which used to live in the area about 150 million years ago.

Junction list

Junctions
N19 France

Autostrasse A16
Border Delle/Boncourt - in work 2008
(1) Boncourt - planned until 2010
Tunnel - planned until 2010
(2) Bure - planned until 2010
Tunnel - planned until 2014
Autobahn

Autobahn end (until 2014)
(3) Chevenez
(4) Porrentruy-Ouest
(5) Porrentruy-Est
(6) Courgenay
Autostrasse
Tunnel du Mont Terri (4100 m)
(7) Saint-Ursanne
Tunnel du Mont-Russelin (3600 m)
Autobahn
(8) Glovelier
(9) Bassecourt
(10) Delémont-Ouest
(11) Delémont-Est
Autobahn end (until 2012)

Autostrasse
Tunnel - in work until 2012
(12) Choindez - in work until 2012

Autostrassen end (until 2012)
Autostrassen end (until 2008)

Autobahn
(13) Moutier-Nord - in work until 2008
Tunnel - in work until 2008
(14) Moutier-Sud - in work until 2008
Autobahn end (from 2008 to 2011)

Autostrasse
Tunnel - planned until 2011
(15) Court - planned until 2011
Autobahn
Tunnel - planned until 2015
Tunnel - planned until 2015
(16) Loveresse
Autostrasse
Tunnel - planned until 2011
Autobahn

Autobahn end (until 2011)
(17) Tavannes
Tunnel de Pierre Pertuis (2100 m)
(18) Sonceboz
(18) Sonceboz
(19) La Heutte
Autobahn end

Hauptstrasse N6
Strassenteilung
östl. Strasse:
(20) Péry
(21) Zone Industrielle
(22) Frinvillier
westl. Strasse:
(22) Frinvillier
Zusammenkunft der beiden Strassen

Autobahn end
(23) Biel/Bienne
(24) Junction Kreisel Bözingenfeld

A5

Notes

  1. ^ "Die Schweitzer Autobahnen", web: Autobahnen.ch

References

This article incorporates information from the German Wikipedia.

External links